GROUP 5
THE CONCEPT OF CONTINUOUS IMPROVEMENT BY TQM
TQM is
mainly concerned with continuous improvement in all work, from high level
strategic planning and decision-making, to detailed execution of work elements
on the shop floor. It stems from the belief that mistakes can be avoided and
defects can be prevented. It leads to continuously improving results, in all
aspects of work, as a result of continuously improving capabilities, people,
processes, and technology and machine capabilities.
Continuous
improvement must deal not only with improving results, but more importantly
with improving capabilities to produce better results in the future. The five
major areas of focus for capability improvement are demand generation, supply
generation, technology, operations and people capability.
A central
principle of TQM is that mistakes may be made by people, but most of them are
caused, or at least permitted, by faulty systems and processes. This means that
the root cause of such mistakes can be identified and eliminated, and
repetition can be prevented by changing the process.
There are
three major mechanisms of prevention:
- Preventing mistakes (defects) from occurring (Mistake - proofing or Poka-Yoke).
- Where mistakes can't be absolutely prevented, detecting them early to prevent them being passed down the value added chain (Inspection at source or by the next operation).
- Where mistakes recur, stopping production until the process can be corrected, to prevent the production of more defects. (Stop in time).
The basis
for TQM implementation is the establishment of a quality management system
which involves the organizational structure, responsibilities, procedures and
processes. The most frequently used guidelines for quality management systems
are the ISO 9000 international standards, which emphasize the establishment of
a well- documented, standardized quality system. The role of the ISO 9000
standards within the TQM circle of continuous improvement is presented in the
following figure.
Continuous
improvement is a circular process that links the diagnostic, planning,
implementation and evaluation phases. Within this circular process, the ISO
9000 standards are commonly applied in the implementation phase. An ISO 9000
quality system also requires the establishment of procedures that standardize
the way an organization handles the diagnostic and evaluation phases. However,
the ISO 9000 standards do not prescribe particular quality management
techniques or quality-control methods. Because it is a generic organizational
standard, ISO 9000 does not define quality or provide any specifications of
products or processes. ISO 9000 certification only assures that the
organization has in place a well-operated quality system that conforms to the
ISO 9000 standards. Consequently, an organization may be certified but still
manufacture poor-quality products.
IMPLEMENTATION PRINCIPLES AND PROCESSES
A
preliminary step in TQM implementation is to assess the organization's current
reality. Relevant preconditions have to do with the organization's history, its
current needs, precipitating events leading to TQM, and the existing employee
quality of working life. If the current reality does not include important
preconditions, TQM implementation should be delayed until the organization is
in a state in which TQM is likely to succeed. If an organization has a track
record of effective responsiveness to the environment, and if it has been able
to successfully change the way it operates when needed, TQM will be easier to
implement. If an organization has been historically reactive and has no skill
at improving its operating systems, there will be both employee skepticism and
a lack of skilled change agents. If this condition prevails, a comprehensive
program of management and leadership development may be instituted. A
management audit is a good assessment tool to identify current levels of
organizational functioning and areas in need of change. An organization should
be basically healthy before beginning TQM. If it has significant problems such
as a very unstable funding base, weak administrative systems, lack of
managerial skill, or poor employee morale, TQM would not be appropriate.
However, a
certain level of stress is probably desirable to initiate TQM. People need to
feel a need for a change. Kanter (1983) addresses this phenomenon as describing
building blocks which are present in effective organizational change. These
forces include departures from tradition, a crisis or galvanizing event,
strategic decisions, individual "prime movers," and action vehicles.
Departures from tradition are activities, usually at lower levels of the
organization, which occur when entrepreneurs move outside the normal ways of
operating to solve a problem. A crisis, if it is not too disabling, can also
help create a sense of urgency which can mobilize people to act. In the case of
TQM, this may be a funding cut or threat, or demands from consumers or other
stakeholders for improved quality of service. After a crisis, a leader may
intervene strategically by articulating a new vision of the future to help the
organization deal with it.
A plan to implement TQM may be such
a strategic decision. Such a leader may then become a prime mover, who takes
charge in championing the new idea and showing others how it will help them get
where they want to go. Finally, action vehicles are needed and mechanisms or
structures to enable the change to occur and become institutionalized.
EVALUATION
AND FEEDBACK
The
business/project manager must regularly collate and analyze the results of
quality control activities and other relevant information about the
business/project. This analysis will lead to the prompt identification of
general trends or issues and allow the early implementation of corrective
action.
Quality control activities will normally identify a number of incidents and it is important to assess whether an incident is:
Quality control activities will normally identify a number of incidents and it is important to assess whether an incident is:
- An isolated case; or
- Part of a pattern that will result in the problem recurring;
Realistic
corrective actions need to be developed by the business/project team to address
the issue or problem. If the cost of the corrective action exceeds its
benefits, then the business/project manager must identify a more acceptable
alternative, which may be to take no action.
If a
problem is identified by an external quality assurance function, the external
staff should work with the business/project team in a consultative manner to
identify appropriate corrective action.
Examples
of corrective action that may be considered include:
- Reworking of a deliverable;
- Changing of methods or standards;
- Refinement of the business/project structure, which may include assigning more experienced resources to the business/project team;
- Changes to the business/project plan or the quality assurance framework such as scheduling more regular peer reviews of deliverables.
Effective
corrective action depends on good records of quality control activities.
Comprehensive records assist the business/project manager to track and identify
the source of defects. Records are also necessary to demonstrate that quality
assurance mechanisms have been established and are working as planned through
effective quality control.
The
business/project’s regular reporting must include summaries of the action that
has been taken to address quality control incidences. The reports should also
demonstrate that the effectiveness of the corrective action has been reviewed
to ensure that the problem or defect has been successfully rectified and will
not recur.
The steps
that need to be taken to implement corrective action include:
- Collecting, collating and integrating the quality control data and statistics;
- Identifying and categorizing the defects and non-conformities to determine if problems are unique (one-time) or recurring;
- Analyzing categorized data to identify trends early;
- Identifying realistic corrective actions and selecting the most cost effective solutions;
- Implementing the solution and measuring the results;
- Maintain good records of quality control activities;
- Follow-up and monitor the effectiveness of the corrective actions.
CONCLUSION
TQM
encourages participation amongst shop floor workers and managers. There is no
single theoretical formalization of total quality, but Deming, Juran and
Ishikawa provide the core assumptions, as a "...discipline and philosophy
of management which institutionalizes planned and continuous... improvement ...
and assumes that quality is the outcome of all activities that take place
within an organization; that all functions and all employees have to
participate in the improvement process; that organizations need both quality
systems and a quality culture.".
TQM prize
schemes such as the Malcolm Baldridge Award focus on competitiveness through
continuous improvement and customer satisfaction. This is barely addressed in
ISO 9000. The intent of the ISO 9000 series is to establish and maintain a
basic quality system to assure customers that organizations have the capability
to produce and provide quality products and/or services. As such, the principal
scope of ISO 9000 is to facilitate and enhance trade (Rheimann, 1993). Quality
management is the responsibility of all participants and stakeholders in a
business/project. The business/project team and the business must work closely
together to ensure that there is an appropriate level of confidence in the
quality of deliverables.
The key
management roles and their major responsibilities are:
- Senior management, who must fully support the actions that are required to maintain the business/project’s quality and ensure that all stakeholders and participants in the business/project adhere to those actions.
- Business/project sponsor, who is responsible for:
·
ensuring
that the required resources are available;
·
ensuring
there is active participation in the quality management process by all
stakeholders in the business/project;
·
monitoring
the effectiveness of the quality assurance framework;
- Business/project manager, who is responsible for:
·
driving
and managing all aspects of the business/project’s quality;
·
planning
for quality and the development and implementation of the quality assurance
framework;
·
continual
monitoring of the effectiveness of the quality assurance framework;
·
regular
reporting of progress to the business/project sponsor and steering committee;
- Business unit representatives, who must support the implementation of the actions and processes that are adopted for the quality assurance framework.
- Business/project team members, who are responsible for:
·
adhering
to the guidelines set out in the quality assurance framework;
·
conducting
quality control activities;
Some
business/projects may also warrant specialist quality assurance and control
resources. These resources may be assigned to the business/project team or may
be required to act as an external quality audit function.
CASE STUDY
Diffusion in Kosovo
Quality
standards are becoming more and more important for Kosovo.
In 2002
the 1st European Quality Days in Kosova“, took part from 27 to 28 September in
Prishtine, Kosova. Although Kosovo stands on the beginning of implementing
quality management in daily business it will soon become very crucial as the
following press releases say:
Research project: Establishing a sustainable Quality
Management System for potato processing in KOSOVO according to international
standards
The
LUKO SH. A. is a small factory with about 25 employees in northwest of Kosovo,
which produces prommes chips out of domestic raw potatoes and is know under the
name of «LUKO». The company was founded by the Swiss agency Agentur IDEAS
(Independent Development Experts Association) in 2003. Within the scope of a
diploma thesis a basic and praxis orientated QMS shall be installed.
Within the
first step the laboratory was build up, the quality criteria were defined and
the employees were taught. In the second step the quality problems were
identifies and analyzed. Furthermore the production process was optimized and
new work flow description was implemented. Finally a quality manager was
recruited and trained on the job. With the implementation falling into international
standards and norms the LUKO SH. A. will belong in future to the most modern
companies in Kosova. The opportunity producing pommes chips with constant
quality offers new markets and is a big step toward industrial development of
Kosova.
REFERENCES
1.
http://www.ear.europa.eu/publications/main/pub-press_release_kos_20061207.htm.
2.
TQM
Text with Cases 3rd Edition, John S. Oakland.
3.
Total
Quality Management; Theory, Concept and Series. KIM Management Training series.
KISII
UNIVERSITY COLLEGE
COURSE CODE: BCOM 472
COURSE TITLE: TOTAL
QUALITY MANAGEMENT
GROUP
MEMBERS.
1. SANCHA
NEHEMIAH LESHAN C12/60326/08
2. BENSON
KANGANGI KAMAU C12/60249/08
3. CAROLYNE
TABITHA MUKAI C12/60302/08
4. NAHASHON
N. NTHENYA C11/60215/08
5. KIBIA
JOHNSON KOINE C11/60197/08
6. JOYCE
NEKAPI KEREMBE C12/60330/08
7. JOAN
JEBIWOT KIPTUM C12/60283/08
8. MARY
WANJIRU GICHUKI C11/60202/08
9. HANNAH
NJERI MAINA C11/60229/08
10. FANCY
CHELANG’AT KIRUI C12/60303/08
SUBMISSION
DATE: 22ND FEBRUARY, 2012.
Hurrah, that’s what I was trying to get for, just what a stuff Presented at this blog!! Thanks admin of the site. AQM Auditing
ReplyDelete
DeleteIEEE Final Year projects Project Center in Chennai are consistently sought after. Final Year Students Projects take a shot at them to improve their aptitudes, while specialists like the enjoyment in interfering with innovation. For experts, it's an alternate ball game through and through. Smaller than expected IEEE Final Year project centers ground for all fragments of CSE & IT engineers hoping to assemble. <Final Year Projects for CSE It gives you tips and rules that is progressively critical to consider while choosing any final year project point.
JavaScript Training in Chennai
JavaScript Training in Chennai
The Angular Training covers a wide range of topics including Components, project projects for cseAngular Directives, Angular Services, Pipes, security fundamentals, Routing, and Angular programmability. The new Angular TRaining will lay the foundation you need to specialise in Single Page Application developer. Angular Training
Just acquired your blog post yesterday morning we have already been reading keep in mind this persistently. You will get a lot of helpful tips the following and i absolutely love your thing for this web presence at the same time. Carry on favorable occupation! AMREP Singapore
ReplyDeleteI wish to indicate because of you only to bail me out of this specific trouble.As a consequence of checking through the net and meeting systems that were not beneficial, I thought my life was finished
ReplyDeleteProject Management Apps
Very Nice. This blog is very useful to me. Now I have clarified my doubts on ISO 9001 Certification
ReplyDeleteThank you so much for sharing this details.
ReplyDeleteISO Certification in Bahrain
thanks for posting. Keep sharing more and more SEO Online Training
ReplyDeleteJava Online Training
python Online Training
Salesforce Online Training
Tableau Online Training
Very Nice. This blog is very useful to me. Now I have clarified my doubts ... ISO 9001 Certification in Qatar
ReplyDeleteTwenty years ago, the shortage of competition and a high barrier to entry into the studio business was enough to almost ensure substantial profits for the studio owner, albeit the inspiration was but perfect. But very similar to the new housing boom within the early 2000's that flooded the market with poorly built homes made for quick profit, the house and project studio boom flooded the market with discount pricing and, generally , a subpar product. Many professional studios were quick to drop prices, and therefore the professional itself competing directly with home studios. Although it seems ridiculous that Rolls Royce might be an immediate competitor to Hyundai, that's exactly what went on within the recording industry. Studios built without proper foundations were exposed and made to compete on price alone.
ReplyDeletehandyman Mobile AL
This blog is very informative thanks for sharing and keep on posting .#ISO 9001 LeadAuditor
ReplyDeleteVery nice blog, thanks for sharing with us..QMS ISO 9001:2015
ReplyDeleteThanks for sharing this great content. You can also check this Similar site for CMQ
ReplyDeleteProcess Industrial Engineering.
ReplyDeleteProcess Industrial Engineering is Industrial engineering carried on processes to do productivity improvement.
It has two important components: Process Machine Effort Industrial Engineering and Process Human Effort Industrial Engineering.
#IndustrialEngineering #Productivity #CostReduction #ProductivityEngineering
Continuous Improvement & Employee Participation Principle of Industrial Engineering
ReplyDeletehttp://nraoiekc.blogspot.com/2017/06/15-continuous-improvement-employee.html
Superb. I really enjoyed very much with this note here. Really it is an amazing note I had ever read. I hope it will help a lot for all. Thank you so much for these amazing notes and please keep updated like this excellent article. Thank you for sharing such a great blog with us. Also, check out our website for Best ERP Software in Chennai
ReplyDeleteThis blog is really helpful to deliver updated affairs over internet which is really appraisable. custom erp development
ReplyDelete